Cut Soil Reinforced Earth Wall Method - Pan Wall
Safe reverse winding construction method for ground reinforcement.
The PAN (Panel And Nail) WALL method is a construction technique based on the theories of steep slope stabilization and ground reinforcement. By achieving a steep slope (1:5 to 1:1), it preserves the natural slope as much as possible and is a highly safe method based on the reverse wrapping technique.
- Company:矢野コンクリート工業
- Price:Other